1 / 5
Wing Solar
| Still deciding? Get samples of $ ! US$ 0.1/watt Order Sample |
Half-cell design brings higher efficiency:
Manufacturing systems are equipped with sophisticated scheduling and dispatching capabilities, automated material handling functionality, and smart devices utilization.
All cells and modules must pass through a list of 48 different tests to ensure that the visual, optical, electrical, physical, and mechanical properties of the products meet high standards before reaching customers.
| Type | Method | Incoterms | Details |
|---|---|---|---|
| Payment | T/T | EXW / FOB | 30% T/T in advance, balance before dispatch |
| CIF / CFR | 30% T/T in advance, balance against copy of B/L | ||
| Large Order | L/C | Irrevocable | L/C at sight accepted for amounts above US $50,000 |
| Lead Time | 7 to 10 working days after receiving advanced payment | ||