1 / 5
Wing Solar
| Still deciding? Get samples of $ ! US$ 0.1/watt Order Sample |
Manufacturing systems are equipped with sophisticated scheduling and dispatching capabilities, automated material handling functionality, automated manufacturing systems, and smart devices utilization.
All cells and modules must past through a list of 48 different tests to ensure that the visual, optical, electrical, physical, and mechanical properties of the products meet high standards before reaching customers.
| Term Type | Method | Trade Term | Condition |
|---|---|---|---|
| Payment Terms | T/T | EXW / FOB | 30% T/T in advance, the balance to be paid before dispatch |
| CIF / CFR | 30% T/T in advance, the balance against the copy of B/L | ||
| L/C | Irrevocable L/C at sight (for amounts above US $50,000) | ||